Largo Roads to be Resurfaced

Beginning on August 29, 2018, the Streets and Stormwater Division has scheduled our contractor, Asphalt Paving Systems, to perform pavement maintenance on the following roads:

  • Brookfield Drive N
  • Brookfield Drive W
  • Lake Hill Lane
  • Hillcrest Drive
  • Shore Drive
  • East Lake Drive
  • Seacrest Drive
  • E Park Drive
  • Keene Lake Drive
  • Keene Park Drive E
The work will be performed in order to extend the life of the roadway pavement and minimize future maintenance costs. This work is planned to be accomplished in two steps.

Step 1: Crack Sealing
This work is scheduled to begin August 29th.  Cracks in the pavement and along the edge of patches will be sealed with a rubberized asphalt material.  This work will be done one lane at a time, with minimal disruption to traffic. There may be short periods where individual driveways will not be available; however, these times should be less than 30 minutes in length.

Step 2: Micro Paving
This step is tentatively scheduled to begin in early October.  Materials will be placed over the existing blacktop surface providing a new, watertight roadway surface. This process extends the life of the existing roadway by both eliminating water intrusion and providing a new driving surface.  There will be a period of approximately 3 hours when the road will be closed to traffic.   Affected residents will be notified through the use of door hangers two weeks before the expected time such closure will occur.

If you have any questions or would like more information, please contact Taylor Cook, Streets Maintenance Coordinator at 727-587-6718 Ext: 4212 or [email protected].