Engineering Project 2007-03 Sunset Manor

Engineering Project 2007-03 Sunset Manor

Engineering Project Number and Name
2007-03 McKay Creek Stormwater Retrofit (Sunset Manor)


Project Description

This is a cooperatively funded project through Agreement Number N250 between the City of Largo and the Southwest Florida Water Management District. This project will provide improvements to the upland cut outfall ditch located east of Barlow Drive and west of Twin Lakes Drive from Sunset Drive to Bluffs Drive, which is a tributary to a downstream canal/creek system known as McKay Creek. The banks of the existing outfall ditch are overtaken by exotic and invasive vegetation and have eroded to a condition that requires complete reconstruction. The improvements will consist of stabilizing the channel slopes with gabion baskets to prevent ongoing bank erosion and and constructing a concrete ramp to improve maintenance access. The project will also include a sediment trap, enhanced wet detention zones and vegetative plantings, which are designed to improve downstream water quality. The purpose of the treatment provided is not to meet any regulatory requirements, but is to improve overall water quality within the watershed.



Contract Number and Name
12-C-405 McKay Creek Stormwater Retrofit (Sunset Manor) Improvments

Project Contacts






Project Manager

Leland Dicus

Office: 587-6713

E-mail
Project Engineer

Rafal Cieslak

Office: 587-6713
E-mail
Project Construction Inspector

Brian Highnote

Office: 587-6713
E-mail


Project Phases








Evaluation

Design

Bid

Award

Construction
Nov. 2010 - Dec. 2010

Dec. 2010 - Oct. 2011

May 2012

TBD
TBD

Project Financials












Task

Description

Vender

Budget

Expended

Percent Complete

Last Updated
Survey

Pre-design Survey

Polaris

$20,750

$20,750

100%

Nov. 01 2010
Design
Project Design

In-House
$95,000

$92,5.00

95%

Oct. 01 2011
Construction
Project Construction

T.B.D.

$1,330,800

$0
0%

TBD
Construction

Project Inspection
In-House
$40,000

$0

0%
TBD

Documents and Deliverable's




Document

Posted/Updated Date

Due Date
Sunset Manor PMP

Nov. 11 2010

-
Sunset Manor Schedule

Dec. 21 2010

-
SWFWMD Coop. Funding Agreement

May 01 2012


SWFWMD Permit

May 01 2012

Contract Documents

May 01 2012

Design Plans

May 01 2012