City of Largo, Florida
|
Engineering Project 2007-03 Sunset Manor
|
Engineering Project 2007-03 Sunset Manor
| Engineering Project Number and Name |
2007-03 McKay Creek Stormwater Retrofit (Sunset Manor) |
| Project Description |
|
This is a cooperatively funded project through Agreement Number N250 between the City of Largo and the Southwest Florida Water Management District. This project will provide improvements to the upland cut outfall ditch located east of Barlow Drive and west of Twin Lakes Drive from Sunset Drive to Bluffs Drive, which is a tributary to a downstream canal/creek system known as McKay Creek. The banks of the existing outfall ditch are overtaken by exotic and invasive vegetation and have eroded to a condition that requires complete reconstruction. The improvements will consist of stabilizing the channel slopes with gabion baskets to prevent ongoing bank erosion and and constructing a concrete ramp to improve maintenance access. The project will also include a sediment trap, enhanced wet detention zones and vegetative plantings, which are designed to improve downstream water quality. The purpose of the treatment provided is not to meet any regulatory requirements, but is to improve overall water quality within the watershed. |
| Contract Number and Name |
12-C-405 McKay Creek Stormwater Retrofit (Sunset Manor) Improvments |
| Project Contacts | ||||||
Project Manager | Leland Dicus | Office: 587-6713 | E-mail | |||
Project Engineer | Rafal Cieslak | Office: 587-6713 | ||||
Project Construction Inspector | Brian Highnote | Office: 587-6713 |
| Project Phases | ||||||||
| Evaluation | Design | Bid | Award | Construction | ||||
| Nov. 2010 - Dec. 2010 | Dec. 2010 - Oct. 2011 | May 2012 | TBD | TBD |
| Project Financials | ||||||||||||
| Task | Description | Vender | Budget | Expended | Percent Complete | Last Updated | ||||||
| Survey | Pre-design Survey | Polaris | $20,750 | $20,750 | 100% | Nov. 01 2010 | ||||||
| Design | Project Design | In-House | $95,000 | $92,5.00 | 95% | Oct. 01 2011 | ||||||
| Construction | Project Construction | T.B.D. | $1,330,800 | $0 | 0% | TBD | ||||||
| Construction | Project Inspection | In-House | $40,000 | $0 | 0% | TBD |
| Documents and Deliverable's | ||||
| Document | Posted/Updated Date | Due Date | ||
| Sunset Manor PMP | Nov. 11 2010 | - | ||
| Sunset Manor Schedule | Dec. 21 2010 | - | ||
| SWFWMD Coop. Funding Agreement | May 01 2012 | |||
| SWFWMD Permit | May 01 2012 | |||
| Contract Documents | May 01 2012 | |||
| Design Plans | May 01 2012 |